The contractor installed flooring is all in. Demolition work needed is done. Appliances are actually back (mostly) in place.

Now I’ve got to get the base moldings cut and installed, the transitions from the rooms with newer hardwood in place and finish the office floor.

It is finally starting to feel like the light at the end of this tunnel isn’t a train 🙂

Unfortunately, the motherboard that I ordered for the  VR computer seems to have had flaky memory sockets (I saw a number of reviews reporting similar issues) and I’m returning it. I’ve ordered an alternate (ASUS brand) board as a replacement.

Once I get past my current feeling overwhelmed by the range of issues that must be dealt with I can get back to interesting sandbox stuff.

Got to refinish the top of my desk while the office is ripped apart. I like the desk a lot but it was a bit banged up when we inherited it from the people who had rented our first apartment before us. A good cleaning up followed by a coat of stain and some polyurethane and I expect it will be very nice.

Of course, when the VR machine is together, it will need a place to live. Currently I’m in the process of setting up GFI outlets in the basement and need to grout the area around the drain channel I cut some time ago to ensure that any water that makes it into the basement does not get past the first few feet of floor.

Add in shingling the catio roof and I’m mostly done…